Well starting on the frame today. Getting the top and bottom water sealed today. Stained next weekend. Getting the back, sides, and tile on the 15th. I'm getting excited! Will post pics of the frame w/ top, bottom, and middle panel on tonight or tomorrow!
So... I have the frame, the bottom and the top ready to go. But need a bigger back piece and the sides. Going to have the frame and all the sides together and stained. But won't have it completely done til after we move.
I love this! I'm going to have to show my husband, since he is always planning different cages for the chameleon(that I don't even have yet) and his snakes. I can't wait to see this come along!
Just thought I would add another pic of Freckles enclosure still in the works. 6 1/5 in clearance for lights and then the top piece of plywood will go on tomorrow morning. And yes there will be 2 middle pieces to prevent the tv from falling though
Changing up part of this enclosure. Since my boards where originally cut for 2x4, I'm going to cut the board in 17inx48in... I'm going to leave the 6 1/2 clearance for the lights so it wont overheat inside. I really didnt want to buy a new piece of plywood so I'm just going to cut it to fit the enclosue area. So the inside of the enclosure is 24inx17inx48in still a decent size cage!
Well... I have 15 days to finish freckles enclosure. Started staining it this evening... going to cut the last 2 boards tomorrow and work on the doors tomorrow. Its looking good though!