SaintJimmy
Avid Member
My father and I have been working on this for a long time. In all it cost around 400$ to make.
Completely water-rot/mold/whatever else water related PROOF.
Took the PVC bottom of the cage out and placed it in the new stand, which has a sloped bottom and drain.
Front is plain, back has a rounded rectangle opening for a bucket.
In all this thing is like 7 1/2 feet tall. Never seen Monty so active.
Of course the first thing he has to go do in his new cage stand is poop on it.
Completely water-rot/mold/whatever else water related PROOF.
Took the PVC bottom of the cage out and placed it in the new stand, which has a sloped bottom and drain.
Front is plain, back has a rounded rectangle opening for a bucket.
In all this thing is like 7 1/2 feet tall. Never seen Monty so active.
Of course the first thing he has to go do in his new cage stand is poop on it.