design for wall of vivs

Yes I am right now it's under (my apologize ) I can't link as I'm on my phone. But ill update tonight. I'm trying to sale some stuff so I can buy a circular saw and jig saw and need to get the project fone while we are still here so it can air out while we move
 
Yes I am right now it's under (my apologize ) I can't link as I'm on my phone. But ill update tonight. I'm trying to sale some stuff so I can buy a circular saw and jig saw and need to get the project fone while we are still here so it can air out while we move

Found it:)
 
Progress has been very slow over the past week but work has reastarted on the vivs so should have some more pics soon.
 
update!!

Painting has started!! Not long to go now,painting will take about a week or 2 and must be left for a month to cure so the backgrounds will be made during that time:) so i would say about 7 weeks and it will be done:D ill update with a few pictures later!
 
Sorry havent been able to get any pictures but spraying is almost finished:) all the boards have been primed and most have been sprayed black! Abit more sanding and spraying to go! Im hoping it will be built up in arond 3-4 weeks:D ill try get some pictures tomorrow.
 
This is how its looking so far:) the chameleon vivs are not on top yet but ill post pics as soon as they are, all of the electrics are hidden behind the drawers at the bottom only one of the drawers is in and the front panel isent on yet jusr thought i would update with a picture.
 

Attachments

  • 20121224_173211.jpg
    20121224_173211.jpg
    237.3 KB · Views: 108
Back
Top Bottom